315 Ton Gantry Shear (Q91-315): When a Growing Yard Needs a Real Production Shear

Most yards hit the same wall at roughly the same stage. The small shear that carried the business for the first few years still works, but the material has changed. Thicker plate shows up. Beams arrive more often. Intake climbs past what one machine can clear in a shift. The owner starts to think about a second shift, or a second machine, or something bigger. When sizing hydraulic scrap shear equipment for continuous duty, field data on the 500 Ton Scrap Metal Shear (Q91-500) highlights the link between frame rigidity, cycle speed, and operating cost.

315 Ton Gantry Shear (Q91-315): When a Growing Yard Needs a Real Production Shear - HUAXIN 500 Ton Scrap Metal Shear (Q91-500)
HUAXIN 500 Ton Scrap Metal Shear (Q91-500) undergoing full-load hydraulic pressure and blade clearance inspection at our Tangshan manufacturing base ( Guide #234: 315 Ton Gantry Shear (Q91-315): When a Growing Yard Needs a Real Production Shear ).

That is the buyer our Q91-315 hydraulic gantry shear is written for. This article looks at what it does, what it replaces, and how to tell whether it fits your yard or whether you should look at a smaller or larger machine.

The mid-tonnage position

The product page calls the Q91-315 the mid-tonnage workhorse. It sits between our 200 ton gantry shear and the heavier 500 ton and above machines. It is aimed at mixed ferrous intake climbing past 30 tons a day, plate showing up in thicker sizes, and a second shift on the horizon.

The page lists a daily capacity of 25 to 45 tons, depending on material, loading efficiency, cut length and running hours. It also says the typical buyer is an independent scrap yard with mixed ferrous intake in the 30 to 40 ton per day range, a demolition contractor processing structural salvage, or a small steel mill or foundry handling its own offcuts and returns.

Key figures

Item Q91-315
Shearing force 315 ton
Blade length 1,200 mm or 1,300 mm
Motor power 2×22 kW, 2×37 kW or 2×45 kW (configurable)
Cycle time 20 to 35 seconds per cut
Daily capacity 25 to 45 tons per day, material-dependent
Feeding tank length 4.5 m or 5 m
Power source Electric, generator or diesel
Blades H13 or M6V tool steel, 56 to 62 HRC, four-sided reversible
Automation PLC full-auto, remote control, emergency stop
Certification CE / ISO 9001

What it cuts: 315 Ton Gantry Shear (Q91-315)

The page rates the machine for continuous cutting of steel plate up to 30 mm, with 50 mm sections handled occasionally. Beyond plate, it lists:

  • Rebar, loose or bundled
  • H-beams and I-beams in light and medium sections
  • Steel pipes, bundled or single, within wall-thickness limits
  • Light steel structures such as angle, channel and profile scrap
  • Flattened or pre-treated car bodies
  • General mixed ferrous scrap and demolition salvage

One boundary deserves attention. According to the product page, HMS 1 and 2 is handled only occasionally, in controlled quantities. The Q91-315 is a mixed-ferrous machine. If heavy HMS at full section thickness is your daily routine, the page recommends a gantry in the 500 ton class or above. We would give the same advice.

Cutting H-beams and structural steel

This machine is a guillotine-type gantry shear. Material is loaded into the feeding tank by excavator or grapple. A hydraulic pushing cylinder advances it to a preset position. A hold-down cylinder clamps it, and the blade descends, cuts and retracts. The page describes a full cycle of 20 to 35 seconds.

For beams, a few practical points help.

  • Choose the blade length by your longest regular section. The page suggests 1,200 mm for compact yards and shorter stock, and 1,300 mm when intake includes longer beams and bundled sections.
  • Use PLC presets. The page says material-specific presets make switching between plate, profile and mixed scrap a preset change instead of an operator recalculation.
  • Be realistic about “light and medium.” The page lists light and medium structural sections. Heavy sections call for a higher-capacity model.
  • Plan for the heavy end of the cycle time. Beams and thick sections are more likely to sit toward the slower end of the 20 to 35 second range.

One shear instead of two

The product page makes a point that rings true. Much of the demand for this class comes from consolidation. A yard running two small shears pays twice the labor, twice the maintenance attention and twice the floor space, and still struggles with heavier material.

The page argues that one Q91-315 can replace both, run with a single operator, and clear plate and beam stock that smaller machines can only nibble at. That will not be true for every yard. If your two small machines run on different materials at the same time, keeping both may suit you better. But if both are bottlenecked on the same stream, consolidation deserves a hard look.

Where it is not the right choice

The page is clear about this, and so should an article be. If your daily intake is still under about 20 tons, the 200 ton machine is the better fit. The page includes a simple comparison:

Your material profile Better machine
Light scrap, rebar and profile, under 25 t/day Q91-200
30 mm plate continuously, mixed ferrous, 30 to 45 t/day Q91-315
Heavy structural, continuous HMS, 50+ t/day 630 Ton Scrap Metal Shear Machine (Q91-630) and above

If you are weighing these options, our article on the 630 ton shear explains what continuous duty means in practice.

Blades: what the page claims, and how to use it

The page states that one complete blade set processes roughly 5,000 to 10,000 tons of scrap before replacement, depending on material and thickness. It also says spare blades ship within 48 hours by DHL or FedEx.

Treat the range as a guide, not a promise. A yard cutting clean structural steel will sit near one end, and a yard cutting abrasive demolition material will sit near the other. Record your own numbers across the first few sets, and use them to plan stock. Even with fast shipping, keep a spare set on site. Shipping time is still shipping time.

Power options

The machine can be configured for 380 V, 400 V, 415 V or 230 V input at 50 or 60 Hz, with electric motor, generator or diesel drive. The page notes that mid-size yards upgrading from smaller equipment often find their incoming supply needs adjusting.

That is worth taking seriously. Motor options are 2×22 kW for generator use or tighter incoming capacity, and 37 to 45 kW for grid-connected yards at the upper end of the 25 to 45 ton band. Send us your power details before the machine is built, and we will specify the right package. Our article on diesel versus electric machines covers off-grid options.

Feeding tank and workflow

The feeding tank is 4.5 m or 5 m. The page notes that longer staging means fewer excavator cycles and smoother continuous cutting at higher tonnages. Both lengths use the same hydraulic pushing system and PLC presets.

Think about the workflow around the tank. Where does the excavator or grapple stand? Where do cut pieces go? How do trucks reach them? A good shear in a bad layout will underperform. Our recycling line design article explains how to plan this.

Support, shipping and warranty

The page says each machine is built to order, with lead time, packing and shipping terms confirmed in the quotation. Standard commissioning support is remote, with installation guidance videos, wiring and hydraulic checklists, video-call startup walkthroughs and crew training. On-site installation by our engineers can be quoted where the project needs it.

The page also states a standard one-year warranty, with extended main-frame coverage available and terms confirmed per order. Always check the written terms in your own contract.

Required Yard Parameters for 315 Ton Gantry Shear (Q91-315)

The product page asks for material type and thickness, required daily capacity, available power supply, preferred blade length, site conditions and destination port. Photos or videos of your material help us recommend the correct configuration.

Send them through our contact page. If your numbers fit the 200T or a larger model better, we will tell you. You can browse the whole scrap metal shear range in the meantime.

Want cycle-time calculations or container loading details for your scrap mix? Compare full machine parameters on our 500 Ton Scrap Metal Shear (Q91-500) page, review our heavy-duty scrap metal shear series engineering hub, or contact HUAXIN’s Tangshan engineering team with your feedstock photos and target daily tonnage.

Similar Posts

2 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *