A gantry shear price is the sum of about ten configuration choices, and shearing force is only the first of them. Two 400-ton machines can be quoted far apart. One has a 1,300 mm blade, a 5 m feed box and a single 45 kW motor; the other has a 1,400 mm blade, a 6 m box and 2×45 kW. This article lists those choices for a hydraulic gantry shear and shows how to line up two quotations so they compare like for like.
We do not publish figures here. Every number below is a specification, not a cost. If you want the general logic for every shear type, start with what decides a scrap metal shear price. This page goes line by line through the gantry machine only.
Why Same-Tonnage Quotes Rarely Match
Take our 400 t class. It offers two blade lengths (1,300 or 1,400 mm), three box lengths (5, 5.5 or 6 m) and three motor packages (45 kW, 2×37 kW or 2×45 kW). That is eighteen mechanical combinations before voltage, climate or shipping enter the picture. A supplier who answers “how much for a 400 ton” with one number has chosen a configuration for you.
Ask which one. Then ask whether that configuration matches your heaviest routine piece, the reach of your excavator or grapple crane, and the supply your transformer can actually deliver at start-up.
Ten Lines That Move a Gantry Shear Price
1. Tonnage class
Force sets frame plate thickness, cylinder bore, pump size and the weight of steel that has to be welded, stress-relieved, machined and shipped, so it moves cost more than any other line. Our range steps from 200 t (2,000 kN) to 2,000 t (20,000 kN) in nine classes. Pick the class from material: 25 mm continuous plate fits the 200 t frame, 100 mm needs 1,000 t.
2. Blade length
Each class offers two lengths, such as 1,800 or 2,000 mm on the 1,000 t model. A longer blade means a wider frame, a longer slide and more tool steel in every one of the four-edge blades you will buy over the machine’s life. Choose it when bundles or wide sections would otherwise need folding twice.
3. Feed box length
Box options run from 4 m on the smallest model to 8 m on the largest. Length costs steel. It adds frame structure, liner plate and a longer side-compression stroke. It pays back where full-length beams, pipe or rail would otherwise need torch prep before loading.
4. Motor package and drive type
Motor kW is a real cost line, and so is the choice between grid electric, generator and diesel drive. The 1,250 t model, for example, comes with 4×45, 5×45 or 6×45 kW. More pump groups lift output toward the top of the 16–20 t/h band. They also ask more of your transformer.
5. Voltage and frequency
We wire the cabinet for 230, 380, 400, 415, 440 or 480 V at 50 or 60 Hz. Common combinations, such as 380 V at 50 Hz, draw on stock motors and starters. A less common one can change motor sourcing and lead time, which shows up in the quote.
6. Control system brand
Every machine has a PLC auto cycle, remote control and emergency stop. Some buyers specify the PLC and electrical brand their maintenance team already stocks. Sensible. It can change component cost, so state it at inquiry rather than after the order.
7. Climate build
Cold-climate and tropical builds are available. They change items such as oil cooling and heating, seals and cabinet protection. A yard running 12 hours a day in high ambient heat should ask for the upgraded cooling up front.
8. Spare parts package
The minimum sensible package is one spare blade set plus common seals and filters. Blades are four-edge reversible in M6V, H13, X45 or D2 tool steel, and the steel choice changes both purchase cost and wear life. Some quotes include spares. Others do not.
9. Installation and commissioning
HUAXIN has 20+ field engineers for installation, commissioning and operator training. Whether one travels to your site, and for how long, is a priced line. Civil work for the reinforced concrete foundation is built locally to our civil drawings and is normally outside the machine quote.
10. Shipping terms
EXW, FOB and CIF are the same machine. Only the logistics change. A 1,600 t or 2,000 t machine is heavy, bulky freight, so the CIF line to a distant port can differ more than buyers expect. Compare quotes on the same Incoterm or the comparison means little.
Judge the Figure Against Tonnes per Day
A shear is bought to move tonnes. Divide each quoted total by the output the configuration will actually reach on your material over a 10-hour day, and the two offers often swap places. The 630 t class, for instance, spans 6.0–8.0 t/h, and where a yard lands in that band depends on motor package, box length and how fast the grapple crane refills the box. A lower quote built on 2×45 kW and the shortest box may sit at the bottom of the band for years.
Labour belongs in the same sum. One operator on a remote runs the machine. Every hour of torch cutting the right box length removes is a saving the quote itself never shows.
A Comparison Sheet for Two Gantry Shear Quotes
Put both quotations into one table before you look at the totals. Blank cells tell you what one supplier left out, and they are usually more useful than the difference between the two totals.
| Line | What to confirm in writing | Why it changes the total |
|---|---|---|
| Force | Tonnage and kN, plus continuous plate limit | Frame and hydraulic size |
| Blade | Length in mm, steel grade, number of usable edges | Tool steel weight and wear life |
| Feed box | Length in m and side compression type | Structure and loader fit |
| Power | Motor count × kW, drive type, starting method | Pumps, starters, site supply |
| Electrical | Voltage, frequency, PLC brand | Component sourcing |
| Climate | Cooling and cold-start provisions | Extra hydraulic equipment |
| Spares | Items and quantities listed | Often omitted to lower the figure |
| Service | Engineer days on site, training scope | Travel and labour |
| Testing | Load test at the factory before shipment | Time on the test bed |
| Terms | EXW, FOB or CIF; warranty length | Freight, insurance, risk |
Our standard warranty is 12 months, and every machine is load-tested at the factory before shipment. If a competing quote promises much more, read what it actually covers. For a full walk-through of one document, see reading a gantry shear quotation line by line.
Where a Lower Number Usually Comes From
In our quoting work, a scrap shear quote that looks low rarely uses a cheaper way to build the same machine. It usually describes a different machine. Typical gaps we see:
- A shorter box than your longest routine piece needs.
- The lowest motor option, which puts output at the bottom of the t/h band.
- No spare blade set, so the first rotation cycle stops the yard.
- Remote commissioning only, when your crew has never run a shearing machine.
- EXW pricing compared against someone else’s CIF.
None of these is wrong in itself, and a yard with an experienced crew and its own hydraulic fitter may genuinely not need an engineer on site for commissioning. The point is to choose each gap knowingly.
Picking the Right Class Before Discussing Cost
The cheapest correction is the one made before the quote.
A yard cutting rebar and 30–40 mm plate at 35–55 t/day fits the 400 ton gantry shear. A mill-side line handling bales, 120 mm plate and 160–200 t/day belongs on the 1250 ton gantry shear. Buying one class too small means extra torch work forever. One class too big ties up capital, power and floor space you do not use.
For plate limits, output and transformer size across all nine classes, use the gantry shear sizing chart.
Questions Buyers Ask About Gantry Shear Price
Why won’t HUAXIN quote a gantry shear price by phone?
Because the figure depends on the ten lines above. Send material, daily tonnage, voltage and destination port, and we can price an exact configuration rather than guess at one.
Does a diesel drive cost more than electric?
It is a different power train, so it is priced as its own configuration. It can still be the cheaper total for a remote or seasonal site where a grid connection would need a new transformer and cable run.
Is the foundation included?
We supply civil drawings. The reinforced concrete foundation is built locally by your contractor and priced separately.
How fast does a written quotation come back?
Within 48 hours of a complete inquiry, with the specification sheet attached.
Tell us your scrap mix, heaviest piece, site power and port on the HUAXIN contact page. You will have a written, itemised quotation within 48 hours.